Projects
Goritsa
“Goritsa” wind farm, with 33,3 MW installed capacity and 33 MW maximum output capacity is located in the Municipality of Thiva, Regional Entity of Viotia and consists of:
- Seven (7) Vestas V90 – 1,8 MW wind turbines
- Six (6) Vestas V117 – 3,45 MW wind turbines
- Control Building
Construction works were completed in October 2017 and the wind farm has been since operating, while the estimated yearly production amounts to 83 GWh.